This video details the installation of the XCharge NZS 200kWh Battery Integrated DC Fast Charger, replacing a Level 2 EVSE. The primary benefit highlighted is the ability to provide high-power DC charging (up to 169kW) with a minimal 19kW grid connection, thanks to the integrated battery. This makes it an ideal solution for locations with high demand charges or limited grid capacity, particularly in rural or infrequently used areas. The installation process, while presented as straightforward, was significantly delayed by permitting issues, taking over six months. The video covers the physical installation, wiring, and the unique aspects of the battery integration, including AC/DC and DC/DC power modules. A key feature is the flexibility to swap charging cables, with the installation of a NACS cable being a notable upgrade. The reviewer expresses excitement about long-term testing and stress-testing the unit, despite a minor electrical incident during the installation process.
Vehicle Specs
| Brand | XCharge |
|---|---|
| Trim | 200kWh Battery Integrated Unit |